Regional Power Demand (AI-Driven)
Projected new demand from India's AI buildout by 2030
Last updated Aug 8, 2026 · data as of Aug 1, 2026
Update frequency: Reviewed monthly; republished when underlying source data changes.
Sources & methodology
Estimate — Modeled or derived by HEF from published inputs. Not an observed value.Refresh pending— last verified 8 August 2026, which is older than this record’s review interval- Sources
- Central Electricity Authority of India (2024) (no link on file)
- China Energy Portal (2024) (no link on file)
- IRENA, Hydropower Potential in South Asia (2023) (no link on file)
- Data as of
- Last verified
- · HEF Research Desk
- Methodology
- Modeled from disclosed and projected data-center capacity additions in India, cross-referenced against average grid draw per MW of AI compute and adjusted for expected efficiency gains through 2030. Figures from 2027 onward are projections, not observed values.
- Caveat
- Projected years assume announced data-center capacity is built on schedule; slippage in grid connection has historically pushed such timelines back.
Think this is wrong? Submit a correction. HEF publishes corrections against the record.
Part of the Global Agenda

Energy Systems
500 GW
Estimated Himalayan hydropower potential, 22% currently tapped
Source: IRENA, Hydropower Potential in South Asia (2023); Ministry of Power, India (2024); China Energy Portal (2024)HEF estimate 8 August 2026source links pending
Latest Intelligence
India's AI Ambition Needs 40–50 TWh of New Power
3 related projects in the Observatory

Technology and Power
40–50 TWh
Projected new annual power demand from India's AI buildout by 2030
Source: Central Electricity Authority of India (2024); China Energy Portal (2024); IRENA, Hydropower Potential in South Asia (2023)HEF estimate 8 August 2026source links pending
Latest Intelligence
India's AI Ambition Needs 40–50 TWh of New Power
1 related project in the Observatory