← Projects
Energy·Planned— Planned — Construction Targeted H1 2026

Wangchhu Hydroelectric Project

Bhutan

Wangchhu Hydroelectric Project
Wangchhu Hydroelectric Project

570 MW

Adani Power–Druk Green Power Corporation joint venture

A 570 MW hydroelectric project in Bhutan, developed as a joint venture between Adani Power and Druk Green Power Corporation, representing an investment of roughly INR 60 billion over a five-year construction timeline.

Capacity

570 MW

Joint venture

Adani Power – Druk Green Power Corporation

Investment

~INR 60 billion

Construction timeline

5 years

Sources & verification

ReportedPublished by a named third-party source and not independently confirmed by HEF.
Sources
  • Adani official release
Data as of
Last verified
· HEF Research Desk

Think this is wrong? Submit a correction. HEF publishes corrections against the record.

Compiled by HEF from publicly reported sources. This entry reflects public reporting, not HEF's own field research or verification beyond the cited source.